PU Cold Room Panel Production Line Manufacturer — Continuous & Discontinuous

Üretim hattı:

PU Cold Room Panel Production Line Manufacturer

We manufacture continuous and discontinuous PU cold room panel production lines (10 – 40 panels/hour) for cold-storage panel manufacturers across 40+ countries.

In one line

Industrial-scale capability: continuous production lines up to 40 panels/hour with full hardware package (profile rollers, gluing stations, double-belt press).

Real Pains We Hear from Buyers — and What We Ship to Solve Each One

Four pains every cold-room-panel factory founder brings us. Our line ships with the fix for each.

Pain 1

Panels fail EN 14509 bond-strength test — steel skin separates from PU core in pull-off test

How we solve it

EN 14509 bond strength ≥0.10 MPa requires steel-skin chemical pre-treatment + PU adhesion calibration + press temp/time control. Our line ships with: PPGI steel skin specifically primed for PU bonding, calibrated cyclopentane PU adhesion package, hot-press 35–45°C control. Field-tested bond strength: 0.12–0.18 MPa, well above minimum.

Pain 2

Continuous press throughput 4 m/min on paper but real-world output is only 2.5 m/min — utilization gap eats my margin

How we solve it

Press throughput drops below spec when foam rise time + line speed + cure profile don't align. Our engineering tunes PU formulation rise time (90–120s) to match your target line speed (3–5 m/min). Pre-shipment FAT runs your actual panel spec on our test line to confirm throughput before crating. Field utilization typically 85–95% of rated speed.

Pain 3

Discontinuous vs continuous press — buyer offers different deal sizes, I don't know which line to invest in

How we solve it

Below 800K m²/year → discontinuous (lower capex USD 800K–1.5M, flexible thickness/length). Above 800K m²/year → continuous (USD 2.5M–5M capex, faster throughput, narrower thickness range). Mixed deals: most factories start with discontinuous, upgrade to continuous after 24 months when commercial orders stabilize.

Pain 4

Fire reaction EN B-s2,d0 needed for EU cold-room tender — my current panels only achieve E-class

How we solve it

Fire reaction class is driven by PU formulation chemistry (flame retardant package) + steel skin thickness + panel joint design. Our PU formulation includes the FR additive package certified to EN B-s2,d0 (limited combustibility). We supply the test certificate pack so EU tender submission has the EN 14509 + fire reaction class B documented.

İhtiyacınız Olan

Discontinuous Cold Room Panel Production Line — 1.2 m × 3/6/9/12/18 m PU Sandwich Panels
Production Lines

Discontinuous Cold Room Panel Production Line — 1.2 m × 3/6/9/12/18 m PU Sandwich Panels

Discontinuous (intermittent press) PU sandwich panel line for steel / PU / steel cold-room panels. Panel width 1.2 m (industry standard). Five standard lengths: 3 / 6 / 9 / 12 / 18 m. Daily output 200–500 m²/shift per press. EN 14509 / ASTM E72 compliant. Best fit for factory owners building a new modular-cold-room or commercial cold-storage panel plant — not for high-volume continuous-belt operations.

Daha Fazla Bilgi
Hardware & Accessories — Bundled with Main Equipment Orders
Hardware & Accessories

Hardware & Accessories — Bundled with Main Equipment Orders

Complementary hardware fabrication service — supplied alongside our main equipment orders (moulds / PU foaming / production line). Custom-fabricated per your drawings: 5 categories — hinges, brackets, rails & ladders, wire shelves & baskets, grid panels. Not a standalone product line. Consolidated into your main shipment.

Daha Fazla Bilgi
Cyclopentane High-Pressure PU Foaming Machine
PU Foaming Machines

Cyclopentane High-Pressure PU Foaming Machine

Our flagship — purpose-built for refrigerator factories chasing A+++ energy class. Cyclopentane-ready out of the box with full ATEX Zone 1 safety package. Three sizes covering 500 to 8,000 cabinets a day.

Daha Fazla Bilgi
PU Raw Materials System
PU Raw Materials

PU Raw Materials System

We make refrigerator-grade PU systems — polyol blend, MDI, blowing agent, all formulated in our own plant. k-factor down to 0.018, density customizable, tuned to your cabinet and your line.

Daha Fazla Bilgi
Spray Foam Equipment for Cold Storage Insulation
PU Foaming Machines

Spray Foam Equipment for Cold Storage Insulation

Spray foam for the refrigerator cabinets a high-pressure machine can't reach — oversized supermarket islands, curved commercial freezers, thick-wall ultra-low-temp boxes, on-site liner repair. 5–20 kg/min.

Daha Fazla Bilgi

From inquiry to first commercial unit — the 6-step delivery flow

From inquiry to first cold-room panel rolling off your line. ~10 months for a discontinuous press line; ~12 months for continuous press.

PU Cold Room Panel Production Line Manufacturer — Continuous & Discontinuous — production line reference
  1. 1

    Inquiry & Volume Scoping

    Week 1–2

    Share target annual m² output, panel thickness range (50–200 mm), steel skin spec (PPGI / PPGL / stainless), target end-markets (industrial cold storage, refrigerated truck body, food processing, modular cold rooms). 1-page proposal in 5 days.

  2. 2

    Detailed Proposal & Press Configuration

    Week 2–4

    Engineering picks discontinuous vs continuous press based on volume target. Sized for your steel skin spec + foam thickness range. PU formulation specced (cyclopentane standard, HFO for ULT). Quote with 22-line BOM in 14 days.

  3. 3

    Contract & Panel Design Freeze

    Week 4–8

    30% down. Panel CAD + steel skin profile + joint geometry frozen. Fire-reaction class certification target signed off.

  4. 4

    Mould + Continuous Press Build

    Month 3–8

    Press: 90–120 days. PU machine: 60 days. Foaming + steel coil handling stations: 60 days. Pre-shipment FAT — we run your actual panel spec on our test line and ship the production validation report.

  5. 5

    Sea Freight & On-Site Installation

    Month 8–11

    6–10 × 40' containers from Shanghai/Ningbo. On-site installation 5–7 weeks (longest among cabinet lines). Building floor reinforcement + 6m+ ceiling height + continuous floor 30m+ required.

  6. 6

    Commissioning, EN 14509 Testing & Acceptance

    Month 11–12

    First 2000 m² panel produced and tested through EN 14509 bond strength + fire reaction + thermal conductivity protocols. Operator training. Acceptance signed when 1000 consecutive m² pass spec. 60% payment due here, 10% after 6-month production volume verification.

Insulated panel plant engineering

Panel Line & Fire-Class Configuration

Industrial cold-room contractors spec panels to EN 14509 + fire reaction class. 4 axes per project tender.

Panel thickness

50 / 80 / 100 / 120 / 150 / 200 mm. Continuous press line covers 50–200 mm; discontinuous covers 50–250 mm.

Steel skin

PPGI / PPGL / stainless. 0.4 / 0.5 / 0.6 / 0.8 mm gauge. Chemical pre-treatment calibrated for PU bond strength ≥0.10 MPa.

Fire reaction class

Standard E (PU + FR additive) / B-s2,d0 (EU cold-room tender). Test certificate pack with line.

Line throughput

Discontinuous press USD 800K–1.5M (240K–800K m²/year) / continuous press USD 2.5M–5M (800K–2M m²/year).

Shared engineering reference

PU foam quality, testing and acceptance

Closed-cell ratio, density uniformity and thermal testing are documented once in our quality center.

View quality standards →

Application Scenarios

Cold-room panels serve industrial, logistics, and pharmaceutical buyers.

  • Food processing cold storage (meat / poultry / dairy)
  • Frozen seafood warehouse (-25 to -40°C)
  • Pharmaceutical cold storage (vaccine warehouse, +2 to +8°C)
  • Supermarket central kitchen cold room
  • Refrigerated truck body sidewall & roof panels
  • Modular cold room (prefab, ship-and-assemble)

Questions factory owners ask us

What's the typical investment for a continuous cold-room panel line?
USD 1.4M–2.8M depending on panel width (1m / 1.2m) and length (6m / 12m / 18m). Includes foaming station (USD 380K–580K), continuous double-belt press (USD 480K–780K), cutting station (USD 220K–340K), stacking/palletizing (USD 180K–280K), and installation. ROI 24–42 months for cold-room contractor businesses.
Can you supply spray-foam systems for in-situ application separately?
Yes. Spray-foam systems alone (without continuous panel line) cost USD 35K–95K for 8–25 kg/min output capacity. Used by cold-storage refurbishment contractors and on-site insulation applicators. Includes hose, gun, transfer pumps and material heating system. Operator training included.
Do you supply the refrigeration plant for the cold storage room itself?
No — we supply the panel production line for cold-room construction, not the refrigeration plant. Refrigeration units (compressors, evaporators, expansion valves, controls) are supplied by HVAC-R plant contractors. Our scope ends at the insulated panel; theirs starts at cooling generation.
What's the typical panel cost per square meter from a line we'd buy?
Production cost USD 18–32 per m² for 100 mm panel with PPGI steel skin (raw material + labor + utility, excluding amortization). Sale price typically USD 35–75 per m² to cold-room contractors depending on market and panel spec. Line ROI calculation should use 30–50% gross margin assumption.
How long does a continuous panel line take to commission?
Mould design: 45–60 days. Continuous press fabrication: 90–120 days. Foaming station and material handling: 60–90 days in parallel. Site installation and commissioning: 45–75 days. Total: 8–11 months from contract. Building requirements: 30 m+ continuous floor length, 6 m+ ceiling height, dedicated electrical supply.

ROI · Cost Analysis

Investment Range & Payback

Indicative range based on 1,800+ delivered lines. Final pricing depends on automation level + add-ons + local labor cost. Request a quote for your spec.

Investment
USD 800K – 5.0M
Payback
16–30 months
Annual Throughput
240K–2M m²/year

Configuration note: Discontinuous press: USD 800K–1.5M, payback ~24 months. Continuous press: USD 2.5M–5M, payback ~16 months at 800K+ m²/year. Includes EN 14509 + fire-reaction class B testing rigs.

Service & Support

Warranty & Service

On-site intervention available in every region where we have delivered projects.

On-Site Installation

Our engineers fly to your factory to supervise installation, layout verification, and first-run production.

Commissioning + Tuning

Trial run + parameter tuning to your local raw material, climate, and target product spec — until throughput meets contract.

Operator Training

5-10 day on-site training for production team, QC, and maintenance — bilingual manuals + video tutorials provided.

3-Year Warranty + Spares

Core equipment 3-year warranty, electrical 2-year. Spare parts in stock with global express shipment 24h dispatch.

Bu Hat için Özel Teklif İste