Lini Foam Kabinet AHU HVAC

Lini produksi untuk:

Lini foam panel kabinet AHU untuk produsen peralatan HVAC

We manufacture HVAC AHU air-handler panel foaming lines — PU sandwich panels 30 – 150 mm, 50 – 500 cabinet sets/day, EN 1886 T-class support.

In one line

2 HVAC cabinet OEM projects delivered — focused exclusively on the insulated-cabinet panel stage, the narrow slice of HVAC plant where PU foaming expertise matters most.

!
Scope of Supply — What We Do and Do Not Supply

Scope: we supply only the PU foaming line and moulds for HVAC air-handler (AHU) cabinet production. We do NOT supply compressors, condensing units, refrigerant systems, or full HVAC plant turnkey solutions — contact a dedicated HVAC OEM integrator for those.

Real Pains We Hear from Buyers — and What We Ship to Solve Each One

Four pains every HVAC AHU cabinet factory founder brings us. Our line clears each — staying inside scope (cabinet only, not the full AHU plant).

Pain 1

AHU cabinet panel thermal bridge — building HVAC engineer rejects spec on heat loss calculation

How we solve it

Thermal bridges form at panel-to-frame joints when PU foam doesn't reach edges evenly. Our cabinet mould design fills the full perimeter to ±0.3 mm thickness uniformity. Foam k-factor 0.022–0.024 W/m·K verified shot-by-shot. Joint thermal break gasket integrated into mould geometry. Field-measured U-value: 0.5–0.7 W/m²·K (well below 1.0 W/m²·K threshold).

Pain 2

AHU acoustic spec (LEED healthcare hospital projects) — STC 40 minimum, my current panels only hit STC 32

How we solve it

STC is foam density + panel thickness + panel-to-panel joint design. We tune PU formulation to density 45–50 kg/m³ (vs standard 38–42), panel thickness 50–80 mm, and ship the acoustic test chamber (USD 65K–140K) for ISO 717-1 STC measurement on every cabinet variant before shipping to LEED/healthcare buyers. Field STC: 42–48.

Pain 3

Project-based orders with different sizes per building — modular tooling not flexible enough

How we solve it

Our foaming moulds are reconfigurable ±20% from base mould dimensions (e.g., 1.2×2.4 m base mould covers 0.96×1.92 m to 1.44×2.88 m). Truly custom sizes outside ±20% range need new mould inserts (USD 60K–140K). Most AHU factories carry 3–5 base moulds covering 80% of project orders, plus inserts for major repeat sizes.

Pain 4

Cabinet supply scope vs full AHU plant — buyer keeps asking for fans, coils, motors which I don't supply

How we solve it

AHU plant = cabinet + coil + fan + filter + motor + controls. We supply ONLY the cabinet (foaming line). To keep buyer expectations clean: we ship a scope-boundary letter with every quote stating what's in scope (cabinet panels + foam + finish) and what's out (mechanical components). Most AHU brand customers source coils from Bohn/Bitzer, fans from Ziehl-Abegg/EBM-Papst, motors from ABB/WEG independently.

From inquiry to first commercial unit — the 6-step delivery flow

From inquiry to first AHU cabinet rolling off your line. ~7 months for a 200 units/day AHU cabinet line — faster than refrigerator lines because cabinet structure is simpler.

Lini Foam Kabinet AHU HVAC — production line reference
  1. 1

    Inquiry & Scope Boundary Confirmation

    Week 1–2

    Share target capacity, AHU segment (commercial / healthcare / data center / LEED), cabinet size range, target acoustic + thermal spec. We send 1-page proposal + scope boundary letter (cabinet only, mechanical components sourced by you) in 5 days.

  2. 2

    Detailed Proposal & Acoustic / Thermal Spec

    Week 2–3

    Engineering picks base mould platform sized for 80% of your project order range, PU formulation per acoustic + thermal target, acoustic test chamber if LEED/healthcare positioning. Quote with 16-line BOM in 10 days.

  3. 3

    Contract & Panel Design Freeze

    Week 3–5

    30% down. Panel CAD + joint geometry + foam density target frozen. Acoustic / thermal targets signed off.

  4. 4

    Mould + Acoustic Chamber Build

    Month 2–4

    Cabinet moulds: 45–60 days. PU machine: 45 days. Acoustic test chamber (if optioned): 60 days. Pre-shipment FAT — we run trial cabinets and ship the acoustic + thermal validation report.

  5. 5

    Sea Freight & On-Site Installation

    Month 4–6

    3–4 × 40' containers from Shanghai/Ningbo. On-site installation 2–3 weeks. Standard concrete floor, normal ceiling height — minimal building modifications.

  6. 6

    Commissioning, Acoustic / Thermal Testing & Acceptance

    Month 6–7

    First 30 trial AHU cabinets produced + tested through thermal U-value + STC acoustic protocols. Operator training. Acceptance signed when 20 consecutive cabinets pass thermal + acoustic spec. 60% payment due here.

HVAC panel engineering

Thermal-Bridge & Acoustic Panel Engineering

Project-based AHU buyers need flexibility within ±20% of base mould. 4 axes per tender.

Panel size

Base mould 1.2 × 2.4 m covers ±20% (0.96–1.44 m × 1.92–2.88 m). Outside range: insert moulds (+USD 60K–140K per new size).

Insulation spec

PU foam 30 / 50 / 80 / 100 / 120 / 150 mm. Foam density 38–50 kg/m³ tuned for acoustic + thermal target.

Acoustic target

Standard (no chamber) / LEED healthcare STC 40+ / data-center STC 50+. ISO 717-1 test chamber optional (+USD 65K–140K).

Steel & finish

PPGI / PPGL / stainless skin. 0.5 / 0.6 / 0.8 mm gauge. Brand decal placement, RAL color match for project tenders.

Shared engineering reference

PU foam quality, testing and acceptance

Closed-cell ratio, density uniformity and thermal testing are documented once in our quality center.

View quality standards →

Application Scenarios

AHU cabinets land in commercial, healthcare, and project tender markets.

  • Commercial building HVAC AHU cabinet (office / retail)
  • Healthcare AHU (hospital / clinic, LEED-compliant STC 40+)
  • Data center AHU cabinet (acoustic STC 50+, high-load tropical)
  • Industrial AHU (manufacturing plant air handling)
  • Cleanroom AHU cabinet (pharmaceutical / electronics)
  • Project-tender AHU (school / government building HVAC contract)

Questions factory owners ask us

What's the typical investment for an AHU panel foaming line?
USD 580K–1.2M for a 200 cabinet sets/day line. Includes foaming machines (USD 220K–380K), foaming moulds (USD 140K–280K covering 4 panel size variants), assembly fixtures (USD 120K–220K), and testing equipment (USD 80K–180K). Smaller investment than refrigerator lines because no vacuum-forming, no door moulds, no refrigeration charging.
Can you supply the full HVAC plant (compressors, condensing units)?
No — strictly AHU cabinet panel foaming. Compressors, condensing units, refrigerant systems, fan motors, controls — all out of scope. Refer to a dedicated HVAC plant contractor (Daikin, Carrier, Trane partner integrators). We integrate at the cabinet panel layer; HVAC plant integrator handles everything inside the cabinet.
Do you support custom AHU sizes for project-specific orders?
Yes — AHU OEM business is largely project-based (each building project specs different AHU sizes). Foaming moulds are modular and reconfigurable for non-standard sizes within ±20% of base mould dimensions. Truly custom sizes (large industrial AHU) need separate mould investment USD 60K–140K per new size.
What's the lead time for an AHU foaming line?
Foaming moulds: 45–60 days design + fabrication. Foaming machines: 45–60 days in parallel. Line integration: 60–90 days. Sea shipping: 30–45 days. Commissioning: 30–45 days. Total: 5–7 months from signed contract — faster than refrigerator lines because the cabinet structure is simpler (flat panels, no doors, no glass).
Can you provide acoustic testing equipment for AHU cabinets?
Yes — acoustic testing chamber (sound transmission loss measurement per ISO 717-1) is optional accessory USD 65K–140K. Required if you serve healthcare, data center, or LEED-certified building HVAC programs where acoustic spec is contractually mandated. Standard commercial AHU programs typically don't require it.

ROI · Cost Analysis

Investment Range & Payback

Indicative range based on 1,800+ delivered lines. Final pricing depends on automation level + add-ons + local labor cost. Request a quote for your spec.

Investment
USD 600K – 2.0M
Payback
16–26 months
Annual Throughput
30K–100K cabinet sets/year

Configuration note: Scope = cabinet panels only (we do NOT supply coils / fans / motors). Standard config USD 600K–1.2M. Add LEED/healthcare acoustic test chamber (STC 40+): +USD 65K–140K.

Service & Support

Warranty & Service

On-site intervention available in every region where we have delivered projects.

On-Site Installation

Our engineers fly to your factory to supervise installation, layout verification, and first-run production.

Commissioning + Tuning

Trial run + parameter tuning to your local raw material, climate, and target product spec — until throughput meets contract.

Operator Training

5-10 day on-site training for production team, QC, and maintenance — bilingual manuals + video tutorials provided.

3-Year Warranty + Spares

Core equipment 3-year warranty, electrical 2-year. Spare parts in stock with global express shipment 24h dispatch.

Minta Penawaran Khusus Lini Ini